KODACO

Rack housing line — machine installation

Machines rigged and set for the rack housing line.

Client
KODACO
Location
Ramos Arizpe, Coahuila
Services
Rigging & machine moving

The work

Machines lifted into position with a carry-deck crane, set on their foundations and lined up ready for connection.

Scope

  • Machine rigging and lifting
  • Positioning and setting
  • Levelling and anchoring
On site

Photos from the job

Have a line like this to install?

Send us the equipment list and the date you need it running.

info@borbollagroup.com More projects